Aller au contenu
Accueil » Pre-Inspection Photo Guide / Guide de photos pour Pré-Inspections

Pre-Inspection Photo Guide / Guide de photos pour Pré-Inspections

DISHWASHER // LAVE-VAISSELLE

Must see: plumbing 5/8 water valve, drain spout, wire or plug, the entire niche

EXAMPLE PHOTO TO COME

REFRIGERATOR UNITS// REFRÉGERATION

Must see: entire niche, plug location, 1/4″ prepared water line; any water valve must be accessible at all times, even after installation has been completed (should be in adjacent cabinet, see below)

! – EFinc not responsible for water related issues if a valve or connection is found behind fridge

Fridge Gallery

DO NOT have fridge delivered in crate! Must be put on masonite sheet in front of niche

Water valves and connections must be accessible AT ALL TIMES

HOOD VENTS // VENTILATION

Must see: see ducting, wire/plug, the entire niche (opened/closed) or wall with sufficient anchoring for hood

COOKTOPS // PLAQUE DE CUISSON

Must see: corners of the counter cutout, electrical wire with junction box at the end of the wire

OVENS & STEAM OVENS & MICROWAVES // FOURS & FOURS VAPEUR & MICRO ONDES

Must see: wire or plug, the entire niche

If steam – make sure water valve and drain are accessible at all times (even after installation complete)

WASHER & DRYER // LAVEUSE & SÉCHEUSE

Must see: plugs, water valves and drain, 4″ vent duct (must stick out of wall at least 1.5″)